Project Media & Technical Insights
Technical visuals and exploration insights from Bell Copper’s porphyry copper projects in Arizona.
DISCOVERY HIGHLIGHT
BS-3: The Hole That Changed the Story
BS-3 confirmed the presence of a large concealed porphyry copper system at Big Sandy, establishing the foundation for ongoing expansion drilling and technical advancement.
Big Sandy Porphyry Discovery Presentation — Tim Marsh (CEO & Chief Geologist), Arizona Geological Society, September 6, 2022
Highlights
- 200 m @ 0.42% Cu, 2.4 g/t Ag
- Includes 54 m @ 0.67% Cu
- Confirms concealed porphyry system
BS-3 drill core showing quartz veining and chalcocite-bearing copper mineralization within a phyllic-altered porphyry system.
CEO Perspective
Strategy behind the next phase of drilling, BS-4A
From Discovery to Expansion: Advancing Toward BS-4A
Following the BS-3 discovery, Bell Copper is advancing step-out drilling to expand the footprint of the system and test its full scale.
NEXT PHASE
Mobilization to Site
Preparing for the next phase of drilling at BS-4A
Big Sandy Project Overview
Overview of Bell's 100%-owned Big Sandy project.
Eastern MT Target Overview
Testing two stacked targets with a single drill hole.
Perseverance Project
Hole K-24 is designed to test two distinct stacked targets within the Perseverance system. The upper target comprises the Eastern MT Anomaly identified in 2020, while the lower target evaluates a structural concept analogous to the setting associated with Bell Copper's BS-3 discovery at Big Sandy.
This drilling is being completed in addition to the broader MMDEX exploration program planned for Perseverance.
One Drill Hole. Two Targets.
Current Field Program
Current Field Activity
Drilling underway at K-24, Perseverance Project.
Understanding the System
Animated geological evolution of the Perseverance porphyry system over time.
U.S. CRITICAL MINERALS OPPORTUNITY
This Isn’t Just Copper —
This Is a U.S. Critical Minerals Story
The Big Sandy Project is advancing as more than a traditional copper exploration program. Metallurgical testing confirms high recoveries and strong mineralization characteristics.
82–84% recovery
~25% concentrate grade
Copper
~130 g/t
~68% recovery
Silver
~1,700 g/t (est.)
in molybdenite
Rhenium
In addition to copper, associated metals including silver and rhenium contribute to the project’s strategic importance within the U.S. critical minerals landscape.
Copper extraction up to 96% achieved in leach testing.
Why It Matters
Strong copper recoveries, combined with silver and rhenium potential, position Big Sandy as a strategically relevant development opportunity within a nationally significant mineral corridor.
Field & Exploration Gallery
A visual overview of drilling, core samples, and field activity across the Big Sandy & Perseverance Projects.











